Tech Maven Geospatial · 2026
GridState, VoltGrid, FieldMapper, and GeoVerse 3D share a single operating picture — from FAC-003 clearance in the office to GNSS trim evidence on the right-of-way.
Pitch deck · auto-advances every 7 seconds · use Next / Previous or the side arrows
The gap
Asset records live in the EAM. Corridor GIS lives on a desktop. Vegetation patrols live on paper or a siloed mobile form. The 3D twin is a demo. When a grow-in becomes an outage, the evidence is a folder hunt — not a FAC-003 package.
What breaks
Why vegetation first
FAC-003 requires a documented vegetation program: minimum clearance distance, an inspection cycle, and categorized outage reporting. Manual quarterly walks cannot cover a modern transmission system.
Industry framing from Irth Solutions’ vegetation-management briefing and T&D World risk-based VM case results — planning context, not GridState customer outcomes.
The suite
Hub · API + web
System of record: assets, FAC-003 corridors, MVCD, work orders, NERC CIP, load flow, SCADA/AMI ingest.
Windows GIS
Air-gapped desktop GIS: LiDAR, ΔNDVI, CAD/BIM, 3D twin, corridor change detection, TAK, game-engine tiles.
Field + dashboard
iOS, Android, Windows, and a web work-order dashboard. GNSS, FAC-003 patrols, photos, crew tracking, TAK COP.
XR / AR / MR / VR
Unity geospatial twin: operator assistance, computer vision, voice control, and safety briefing in the corridor.
How they connect
Ingest
Feature services and telemetry keep GridState’s network state current. VoltGrid can also host those layers offline at an EOC.
Decide
Work orders, MVCD, inspection due dates, and CIP evidence are authored once in GridState.
Act
VoltGrid engineers the corridor. FieldMapper executes. GeoVerse 3D briefs and watches clearance.
Share
Crew location, geofence alerts, and 3D tiles close a common operating picture — including when the WAN is down.
Full diagram: suite architecture
FAC-003 workflow
01 SENSE
VoltGrid LiDAR, drone, satellite, ΔNDVI. Ground patrol when needed.
02 MEASURE
GridState FAC-003-5 Table 2, altitude, sag, and growth allowance.
03 RISK
Weather, wind, fire, and growth — not a calendar cycle.
04 DISPATCH
Trim plan becomes an assignment on the live corridor.
05 BRIEF
GeoVerse 3D + voice: stay out of the MVCD while you work.
06 TRIM
FieldMapper photos, location, and form bound to the order.
07 AUDIT
VoltGrid before/after clearance. Failures reopen the order.
08 RECORD
Outage cats 1A–4B, R6 cycle, evidence ready for audit.
Lane diagram: FAC-003 vegetation workflow
GridState · backend + web
FAC-003
Operations
Also on the hub
VoltGrid · Windows desktop GIS
Vegetation desk
Workstation
FieldMapper · iOS, Android, Windows, web
On the ROW
External GNSS / NMEA, offline maps (MBTiles, PMTiles, GeoPackage), photos, signatures, and FAC-003 inspection forms.
Work orders
Blazor web dashboard plus MAUI clients. Offline-first sync, conflict handling, and resumable evidence uploads back to GridState.
Safety picture
Live crew location, geofence alerts, emergencies, and GeoChat — on the device and on the supervisor map.
GeoVerse 3D · XR / AR / MR / VR
Operator assistance
Where it sits
GeoVerse 3D is the immersive client of the suite: VoltGrid supplies terrain and 3D tiles; GridState supplies the network and work order; FieldMapper supplies live crew. Hardware acceptance for XR remains a release gate — the workflow is designed so the headset is assistance, not a single point of failure.
Operating model
A day on the ROW
06:10 · VoltGrid
Overnight ΔNDVI flags the span. LiDAR height proxy confirms canopy into the Gallet distance.
06:18 · GridState
MVCD for 230 kV at this elevation is 4.0 ft sea-level, scaled. Inspection clock is inside the 18-month R6 window — this is a grow-in risk, not a missed patrol.
07:40 · FieldMapper
Trim order hits the crew tablet. GNSS stakeout, photos, and a geofence around the energized corridor.
08:05 · GeoVerse
Headset brief: stay outside MVCD, watch blow-in. Voice confirms “clear to cut” without looking down.
By 14:00 VoltGrid’s after mosaic passes. GridState closes the order and files the evidence. If this span ever becomes a 1A grow-in outage, the package is already built.
Close
Next step: a 30-day vegetation pilot on one applicable corridor — MVCD baseline, one LiDAR or satellite collect, live work orders, and an RSAW-shaped evidence pack at the end of the cycle.
gridstate.techmaven.net · voltgrid.techmaven.net · Tech Maven Geospatial